요약2 |
Through the examination of the interference of the structure and the underground parking lot and the basic examination of the underground floor, it was found out the level error between the drawings and the inconsistency between the architectural drawings and the structural drawings. Respectively. The result of multi-dimensional examination of plane and cross section through 3D has been contributed to reduction of construction time and construction cost through reduction of resources and materials during construction. |