논문집

원문다운로드
논문명 초고층 건축물의 건물 커미셔닝 프로세스 적용 및 시스템 개선방안 제안/Proposal of Energy System Improvements through Building Commissioning Process of High-rise Building
저자명 김효준(Kim, Hyo-Jun) ; 조영흠(Cho, Young-Hum) ; 류성룡(Ryu, Seong-Ryong) ; 조현(Cho, Hyun)
발행사 한국건축친환경설비학회
수록사항 한국건축친환경설비학회 논문집  , Vol.11 No.2
페이지 시작페이지(100) 총페이지(7)
ISSN 1976-6483
주제분류 환경및설비
주제어 건물 커미셔닝 ; 에너지 절감 ; 초고층 건축물 ; 개선방안 Building commissioning ; Energy savings ; High-rise Building ; Improvement
요약2 The purpose of this study is to show the application of building commissioning process for high-rise building in Korea. Building commissioning is an method to resolve operating problems, improve comfort, optimize energy use and identify retrofits for existing commercial and institutional buildings and central plant facilities. The case study building is a 68-story office and hotel with total floor area of 195,324 square meter. An energy audit was conducted to evaluate the indoor comfort and building energy performance. Specific building commissioning process were applied in the building. This study presents procedures, implementations and detailed descriptions of control sequence and operation comparisons for the terminal units and air handling units (AHUs), as well as the chilled water system. The study result shows 20% of energy cost saving.
소장처 한국건축친환경설비학회