요약2 |
In this research, the wall construction method influences the partially exposed situation in the one sided corridor type that is a form of the representing tenement house within the nation. A computer simulation was performed, with the purpose to analyse, suggest problems and development plans of safety in cases of fire. As a result of the analysis, all analyzing cases which the fire scenarios were applied in the middle and end complexes, showed that minimum evacuation time were within 195 seconds and 348 seconds, and if a part of the on sided corridor was opened with fire the safety of the residents were improved and the residential environment too were suggested possible for development. |